Page 25 - Memoria 2021
P. 25
Informe Anual 2022 | Annual Report 2022
Resumen de actividad por línea de negocio | Summary of Activity by bussines line
60
30
0
-30
60
-190 -120 -90 -60 -30 0 30 60 90 120 190
Governmental communications
The SPAINSAT NG program successfully passed clean room of Thales Alenia Space premises in
the critical design review (CDR) of the payload Tres Cantos, Madrid, to begin the activities of
and entire satellite, including the CDR elements of assembly, integration and testing of the payload.
the Pacis-3 association project with the European
Space Agency (ESA). The review was considered “The technical workforce of our co-contractors,
successful after verifying the good progress Airbus Defence and Space and Thales Alenia
made with the tests that were conducted on the Space in Spain and France along with the rest of
payload development models in X band. contractors, are performing some outstanding
work, as well as Hisdesat’s personell in the role
This confirms the robustness of the design of customer”, says Miguel Ángel García Primo,
and technical capabilities of the SPAINSAT CEO of Hisdesat.
NG satellites system which enables the start
of integration activities. In paralell we began Likewise, an important contribution is made
manufacturing the satellite flight components, by ESA and the CDTI in the Pacis-3 program,
for the all-electric Eurostar NEO platforms as a public/private collaboration between ESA
well as the payload. and Hisdesat to develop the most innovative
satellite components, especially the payload in
Additionally, the structure of the Communications X band with the most advanced active radars in
Module of the first satellite SpainSat NG I has Europe and the deployable pallet, antenna and
been delivered and is currently located in the mechanisms in Ka band.
25
25