Page 39 - hisdeSAT annual report 2014
P. 39

Performing at full capacity                    ANNUAL REPORT 2014











                                                 ® SPOT  2004











                                              real-time operational procedures   the nearly 80 orbital determina-
                                              have been completed on the sate-  tion processes conducted throug-
                                              llite, including 54 maintenance and   hout 2014, which allow us to know
                                              orbital control maneuvers as well   the precise position of the satellite
                                              as procedures related to payload   within the orbital window it shares
                                              communications, sensor inhibitions,   with other satellites.
                                              adjustment of on-board clocks, con-
                                                                               Finally, in line with HISDESAT’s
                                              trol parameter updates, memory
                                              dumps, and test runs of redundant   strategic policy to optimise safety
                                              elements.                        and flexibility in the operation of
                                                                               its satellites, control of SPAINSAT
                                              In addition to these real-time pro-  was shared between the two mis-
                                              cedures, numerous satellite status   sion control centres. In the course
                                              monitoring procedures were run,   of 2014 operation was tempora-
                                              allowing to predict the behavior   rily transferred a total of six times
                                              and performance of each subsys-  from the nominal control centre
                                              tem, thus improving operating    at Arganda to the backup control
                                              efficiency and reducing fuel con-  centre at Maspalomas, in order to
                                              sumption.                        keep both sites fully operational and
                                                                               prepared.
                                              Operational  procedures  have
                                              also been effected at the satellite   During the preparation of opera-
                                              ground control centre, for example   tions of the PAZ satellite, we moni-
































                                                           39
   34   35   36   37   38   39   40   41   42   43   44