Page 41 - hisdeSAT annual report 2015
P. 41

A PLENO RENDIMIENT O




























                  The SpainSAT


                              satellite


               continues with


                all subsystems


               fully functional                  Finally, in line with HISDESAT’s stra-
                                                 tegic policy to optimise safety and
                                                 flexibility in the operation of its sate-
                                and all          llites, control of SpainSAT was shared
                                                 between the two mission control cen-
                        redundant                tres. In the course of 2015 operation
                                                 was temporarily transferred a total
                           elements              of six times from the nominal control
                                                 centre at Arganda to the backup con-
                            available            trol centre at Maspalomas, in order to
                                                 keep both sites fully operational and
                                                 prepared.
                                                                                    command and telemetry
                                       At the same time, and in preparation for the ope- reception centre, as well as
                                       ration of the PAZ satellite, the engineering team  the monitoring and control
                                       that will operate the platform, as well as the  system and the flight opera-
                                       teams of operators and mission controllers have  tion system.
                                       been put into place, ensuring that the nominal
                                       operation will be carried out in shifts effectively   In  short,  during 2015  the
                                       and safely. Two daily schedules have been plan-  operation of the space sys-
                                       ned for every day of the year, in accordance with   tems SpainSAT and XTAR-
                                       the satellite contact sessions at the nominal mo-  US for government appli-
                                       nitoring station located in Torrejón.        cations has continued, and
                                                                                    the teams and bases for the
                                       Part of the formation of these teams has been  operation of the PAZ radar
                                       the running of training courses for the opera- Earth  observation satellite
                                       tion of the satellite Control Centre. In particular,  have been created, in kee-
                                       practical training has been provided on the mis- ping with the principal aims
                                       sion planner, the orbital dynamics centre and the  of Hisdesat.


                                        41
                                        41
   36   37   38   39   40   41   42   43   44   45   46