Page 41 - hisdeSAT annual report 2016
P. 41

procedures during 2016, including 57 ma-  out at the satellite control centre, allowing
                                     noeuvres to maintain and control the or-  us to know the precise position of the sa-
                                     bit, more than 120 sensor inhibitions, ad-  tellite within the orbital window it shares
                                     justments of the clock and solar panels,   with other satellites.                PERF ORMING AT FULL C APA CITY
                                     memory dumps, and test runs of redun-
                                     dant elements.                          The operation and control of SpainSAT
                                                                             has been carried out from the two con-
                                     Numerous satellite health status moni-  trol centres of the mission. A total of six
                                     toring procedures were run to establish   temporary transfers of operations have
                                     performance predictions and improve     been carried out from the nominal Argan-
                                     operational efficiency. A reduction in fuel   da control centre, to the backup control
                                     consumption is a good example of the    centre of Maspalomas, thus ensuring that
                                     fruits of this policy.
                                                                             both centres are maintained in full opera-
                                     At the same time, numerous orbital deter-  tional readiness, and optimising the flexi-  41
                                     mination procedures have been carried   bility and safety of the mission.
   36   37   38   39   40   41   42   43   44   45   46