Page 41 - hisdeSAT Annual Report 2017
P. 41

manoeuvres to maintain and control   of six temporary transfers of opera-  the different systems forming part of
          the orbit, sensor inhibitions, adjust-  tions have been carried out from the   the satellite control centre, including
          ments of the clock and solar panels,   nominal Arganda control centre, to   the mission planner, orbital dynamics
          memory dumps, actualisations of on-  the backup control centre of Maspalo-  centre, and the command and tele-
          board  parameters,  and  test  runs  of   mas, thus ensuring that both centres   metry reception centre.
          redundant elements.               are maintained in full operational rea-
                                            diness, and optimising the flexibility   In summary, throughout 2017 Hisdes-
          Numerous satellite health status mo-  and safety of the mission.     at continued with its satellite opera-
          nitoring procedures were also run to                                 tion activity, both in communications
          monitor the health status of the sys-  In parallel with the operation of com-  and  earth observation,  positioning
          tem,  establish  performance predic-  munications missions, in preparation   itself as the only national operator
          tions for each subsystem, improve   for the operation of the PAZ observa-  and one of the few international mul-
          operational efficiency and reduce   tion satellite, whose mission and ope-  ti-mission satellite operators.
          fuel consumption.                 ration is also Hisdesat’s responsibility,
                                            the operation engineering teams and
          About 80 orbital determination pro-  the mission operators/controllers
          cesses have been run to ensure orbital   have carried out numerous tests and
          control of the satellite and precisely   simulations at the mission control
          determine its position, and to calculate   centre. In particular, at the end of
          the manoeuvres necessary to main-  2017 the last tests were carried out
          tain it safely in the orbital window that   between the control centre and the
          it shares with other satellites.  satellite (Satellite Verification Test),
                                            before its transfer to the launch base.
          The operation and control of Spain-
          SAT has been carried out from the two   These activities made it possible to
          con-trol centres of the mission. A total   debug and correct the anomalies of




                                                            41
                                          HISDE S AT       41     PERFORMING AT FULL CAPACITY
   36   37   38   39   40   41   42   43   44   45   46