Page 41 - hisdeSAT annual report 2011
P. 41

FULLY PERFORMING








                                4.3 Development of the




                                Observation Programme




                                In the year 2011, the Paz satellite began finalising the

                                integration of the platform on the premises of EADS

                                Astrium in Friedrichshafen (Germany), where all the

                                functional tests were subsequently performed in order to
                                verify its correct working order.





 Paz satellite assembly process
                                The  platform  tests  were  carried  out  sat-  do  so,  modifications  were  defined  in  both
                                isfactorily and the job of packaging it was   the satellite as well as in the AIS payload it-
                                then embarked upon for its transportation   self, in order to ensure their complete com-
 38  Pelayo  International  University  (UIMP)  of   particularly  HisNorSat,  and  the  challenges   39   to Madrid, to the premises of EADS CASA Es-  patibility. The AIS payload belonging to ex-
 Santander, under the banner: The satellite,   faced by Spanish industry within this field.   pacio as the satellite’s principal contractor.  actEarth will be integrated into the satellite
 key element for a new growth model. In                                 within the first half of 2012.
 it, the important role played for some time   In the same University setting, HISDESAT has   The satellite arrived on the 4th of May, and
 now by the satellite industry was exam-  upheld  for  the  last  8  years  a  sponsorship   was installed in a cleared area of EADS CASA   At the end of 2011, the equipment was re-
 ined in depth, register-  and collaboration with the Polytechnic Uni-  Espacio and a series of functional tests were   ceived for the Radio Occultation experiment
 HISDESAT regularly   ing important growth,   versity of Madrid for its Postgraduate Pro-  then carried out to en-  which  would  enable  the  CSIC  Institute  of
                                                 sure its working order
 gramme of Satellite Communications, which
                                                                        Aerospace Sciences with head offices in Bar-
 contributing to the im-
 participates in   provement  of  produc-  has become a point of reference for profes-  The AIS payload   after the journey. Fi-  celona,  in  collaboration  with  internation-
 sionals who want to pursue a career in the
                                                                        al  groups,  to  develop  atmospheric  profiles
 tivity and transforming
                                                 nal delivery was on the
 research and   other  associated  sec-  aerospace  sector.  The  Satellite  Technology   belonging to    12th of May. From that   with which to generate more precise mete-
                                                 moment on EADS CA-
 tors  such  as  those  of
 Masters Degree is distinguished by incorpo-
                                                                        orological and climatic models. These units
 university   defence,  security,  nav-  rating a high practical content, which takes   exactEarth will be   SA began the work of   will be integrated into the satellite at the
 igation,   communica-  place on the premises of companies such as   integrated into the   integrating the Span-  start of 2012.
  seminars  tions, etc.   Indra, EADS and Hispasat.   ish-made  instrument
             satellite within the                into  the  Paz  platform,   Signature  of  the  contract  with  the  Inter-
 Another  seminar held   HISDESAT is member of the Spanish aero-  work which will extend   national Space Company (ISC) Kosmotras for
 in Santander went un-  space  sector’s  professional  associations,   first half of 2012.  throughout 2011 and   the launch of the Paz satellite enabled HIS-
 der  the  title  of:  “New  technological  chal-  Proespacio  and  TEDAE,  which  recently   2012.  DESAT to progress all work relating directly
 lenges  for  governmental  satellite  com-  merged.                    with the launch of the satellite into orbit,
 munications”,  and  dealt  with  an  analysis   HISDESAT has been working very actively on   closing the interfaces between the satellite
 of  the  challenges  facing  the  modernisa-  the integration of the AIS (Automatic Iden-  and launcher during the month of October,
 tion  of  satellite  communications,  the  se-  tification System) payload into the satellite,   2011. The Baikonur Base has been chosen as
 curity  of  same  for  defence  purposes,  as   defining the most effective configuration for   the base for the Paz launch.
 well  as  the  new  satellite  constellations,   fulfilling the requisites of this technology. To