Page 44 - hisdeSAT annual report 2011
P. 44

FULLY PERFORMING










                                                                                                                                                                                               Lastly, 2011 also saw the start of prepara-
                                                                                                                                                                                               tions for the operation of the Paz low orbit
                                                                                                                                                                                               satellite providing radar observation, main-
                                                                                                                                                                                               taining on-site tracking of the construction
                                                                                                                                                                                               of the platform in the German factory, par-
                                                                                                                                                                                               ticipating in the drawing up of INTA’s Ground
                                                                                                                                                                                               Segment Operations Agreement, and ensur-
                                                                                                                                                                                               ing specification of the mission’s requisites
                                                                                                                                                                                               and monitoring the design and develop-
                                                                                                                                                                                               ment of the satellite control centre, includ-
                                                                                                                                                                                               ing its planner and orbital control centre.

                                                                                                                                                       improving the preparation and response   In short, during 2011 the Operations De-
                                                                                                                                                       time in the event of any anomalous situa-  partment actively participated in HISDESAT’s
                                                                                                                                                       tion that may arise during the operation of   three principal programmes:
                                                                                                                                                       the satellites.
                                  TTC antenna Maspalomas (Canary Islands)                                                                                                                         Defining  the  requisites  and  evaluating
                                                                                                                                                       Continuing  with  HISDESAT’s  strategic  policy   the bids for the future HisNorSat satel-
                                                                                                                                                       of maximizing flexibility and security in the   lite in being responsible for its platform,
                                                                                                                                                       operation of its satellites, SpainSat is con-  launcher and control centre.
         42                     The remainder of real time procedures were                                                      43                     trolled  from  the  two  mission  control  cen-
                                applied  to  the  operation  of  the  communi-                                                                         tres, and 2011 saw six temporary trans-     Monitoring the control centre and pre-
                                cations  payload  and  the  operation  of  the                                                                         fer of operations from the nominal control   paring the operations of the Paz satel-
                                different satellite sub-systems, perform-                                                                              centre in Arganda to the Maspalomas back-  lite, being responsible for its future op-
                                ing, amongst others, sensor inhibitions, ad-                                                                                            up  control  centre,  for   eration and planning.
                                                 justment of onboard                                                                                                    the  purposes  of keep-
               numerous health-                  clocks, memory dumps,                                                                 2011 also saw the                ing  both  centres  fully      Running  real time operation for the
                                                 re-directing  of  panels,                                                                                              operational.              SpainSat satellite for the fifth consecu-
              related procedures                 updating of control pa-                                                          start of preparations                                           tive  year,  being  responsible  for  its  op-

                                                 rameters, test launch of                                                               for the operation               On the other hand,        eration and health, and obtaining sat-
          were also performed,                   redundant  units,  etc.                                                                                                all  the  experience  ac-  isfactory performance from the satellite,

            aimed at monitoring                  Operative   procedures                                                              of the Paz low orbit               quired in the opera-      as with the two control stations located
                                                                                                                                                                                                  in  Arganda and Maspalomas, essential
                                                                                                                                                                        tion  of  geostationary
                                                 were also performed
            the operative status                 on the ground satellite   status of the satellite sub-systems. These                 satellite providing               communication  satel-     for operating with maximum security.
                                                                                                                                                                        lites was utilised in full
                                                 control  centre,  for  the
                                                                        procedures  permit  forecasting  the  perfor-
                     of the satellite            automatic  detection  of   mance of each sub-system and predict their                 radar observation                when it came to draw-
                                                 events, for the purpos-  behaviour,  improving  the  effectiveness  of                                                 ing up and defining the
                        sub-systems              es of reducing response   the  operation,  for  example,  reducing  the                                                requisites of the plat-
                                                 times in the event of   number of duplicate manoeuvres as previ-                                      form,  the  launcher  and  the  control  cen-
                                                 possible  contingencies   ously indicated.                                                            tre for the new  HisNorSat  communications
                                and increasing the reliability of the system.                                                                          satellite, the contractual process for which
                                                                        On the other hand, the operational engi-                                       began in 2011. HISDESAT also actively par-
                                As well as real time procedures, numerous   neering  team  continued  with  their  peri-                               ticipated  in  the  appraisal  of  bids  received,
                                health-related  procedures  were  also  per-  odic simulation and training work on con-                                considering same from a technical as well as
                                formed, aimed at monitoring the operative   tingency  procedures,  for  the  purposes  of                              operational perspective.
   39   40   41   42   43   44   45   46   47   48   49