FULLY PERFORMING










                                                                        Lastly, 2011 also saw the start of prepara-
                                                                        tions for the operation of the Paz low orbit
                                                                        satellite providing radar observation, main-
                                                                        taining on-site tracking of the construction
                                                                        of the platform in the German factory, par-
                                                                        ticipating in the drawing up of INTA’s Ground
                                                                        Segment Operations Agreement, and ensur-
                                                                        ing specification of the mission’s requisites
                                                                        and monitoring the design and develop-
                                                                        ment of the satellite control centre, includ-
                                                                        ing its planner and orbital control centre.

                                improving the preparation and response   In short, during 2011 the Operations De-
                                time in the event of any anomalous situa-  partment actively participated in HISDESAT’s
                                tion that may arise during the operation of   three principal programmes:
                                the satellites.
 TTC antenna Maspalomas (Canary Islands)                                   Defining  the  requisites  and  evaluating
                                Continuing  with  HISDESAT’s  strategic  policy   the bids for the future HisNorSat satel-
                                of maximizing flexibility and security in the   lite in being responsible for its platform,
                                operation of its satellites, SpainSat is con-  launcher and control centre.
 42  The remainder of real time procedures were   43   trolled  from  the  two  mission  control  cen-
 applied  to  the  operation  of  the  communi-  tres, and 2011 saw six temporary trans-     Monitoring the control centre and pre-
 cations  payload  and  the  operation  of  the   fer of operations from the nominal control   paring the operations of the Paz satel-
 different satellite sub-systems, perform-  centre in Arganda to the Maspalomas back-  lite, being responsible for its future op-
 ing, amongst others, sensor inhibitions, ad-    up  control  centre,  for   eration and planning.
 justment of onboard                             the  purposes  of keep-
 numerous health-  clocks, memory dumps,   2011 also saw the   ing  both  centres  fully      Running  real time operation for the
 re-directing  of  panels,                       operational.              SpainSat satellite for the fifth consecu-
 related procedures   updating of control pa-  start of preparations       tive  year,  being  responsible  for  its  op-

 rameters, test launch of   for the operation    On the other hand,        eration and health, and obtaining sat-
 were also performed,   redundant  units,  etc.   all  the  experience  ac-  isfactory performance from the satellite,

 aimed at monitoring   Operative   procedures   of the Paz low orbit   quired in the opera-  as with the two control stations located
                                                 tion  of  geostationary
 were also performed
                                                                           in  Arganda and Maspalomas, essential
 the operative status   on the ground satellite   status of the satellite sub-systems. These   satellite providing   communication  satel-  for operating with maximum security.
                                                 lites was utilised in full
 control  centre,  for  the
 procedures  permit  forecasting  the  perfor-
 of the satellite   automatic  detection  of   mance of each sub-system and predict their   radar observation  when it came to draw-
 events, for the purpos-  behaviour,  improving  the  effectiveness  of   ing up and defining the
 sub-systems  es of reducing response   the  operation,  for  example,  reducing  the   requisites of the plat-
 times in the event of   number of duplicate manoeuvres as previ-  form,  the  launcher  and  the  control  cen-
 possible  contingencies   ously indicated.  tre for the new  HisNorSat  communications
 and increasing the reliability of the system.  satellite, the contractual process for which
 On the other hand, the operational engi-  began in 2011. HISDESAT also actively par-
 As well as real time procedures, numerous   neering  team  continued  with  their  peri-  ticipated  in  the  appraisal  of  bids  received,
 health-related  procedures  were  also  per-  odic simulation and training work on con-  considering same from a technical as well as
 formed, aimed at monitoring the operative   tingency  procedures,  for  the  purposes  of   operational perspective.